Data Center of the company Czech Airlines
Investor: Czech Airlines, a.s. and the Prague Airport
Installation site: Prague Airport, Praha
The task:
- to construct the DC in the office building of the company Czech Airlines
Optimal approach:
- the delivery of a complex solution OptiStructure™, i.e.
- the processing and the design of concept,
- designing of the project documentation,
- assuring the arrangement procedures regarding the installation,
- provision of the project management team,
- physical delivery and installation of technologies
Added value of realized concept:
- ALTRON ensured a complex delivery of all technological infrastructure including necessary construction modifications and the monitoring system;
- ALTRON met specific air-conditioning requirements of given non-standard rooms, the data center has been put into operation without affecting the normal use of the building;
- the DC availability is supported by own monitoring system PROMON™ and all supportive infrastructure is continuously monitored by ALTRON’s surveillance centre