EnergyCentre - Home Credit, Moscow
Investor: Home Credit and Finance Bank
Installation site: Zelenograd Korpus 317a, Moscow, Russia
The task:
- to move the offices as quick as possible into a newly rebuilt house;
- to ensure the project realization conditions in Moscow, close to the Red Square;
- to use the personnel already dedicated for other parallel project
Optimal approach:
- processing of the project documentation;
- transportation, installation and putting into service of a power generating centre composed of backup power supplies (UPSs) and stand-by power generating set;
- implementation of the monitoring system
Added value of realized concept:
- sophisticated control system monitors the operation modes of the equipment and controls automatic starts of generating sets including functions of the main power distribution room;
- ALTRON demonstrated its proficiency and ability to manage more projects abroad at the same time while ensuring excellent delivery terms
