Air traffic control at the Karlovy Vary Airport
Investor: ŘLP ČR s.p. (Air-traffic control)
Installation site: Karlovy Vary Airport
The task:
- to renew the system of emergency electric power supply at the Karlovy Vary Airport
Optimal approach:
- the proposal for technology installation in the new switchboard room;
- the installation of automatic switchboard panel (ATS) for genset, UPS systems APC Silcon (1+1), bypass switchboards, switchboards for parallel operation of battery strings, installation of air-conditioning units;
- the positioning of genset (container type) in proximity of the switchboard room
Added value of realized concept:
- ALTRON realized and managed this contract in mode of operative leasing;
- ALTRON proposed the battery disconnector which allows to re-connect the battery of temporarily failed UPS unit to the operating unit in order to prolong its autonomy time;
- on basis of concluded service contract and using its own system PROMON™, ALTRON ensures the non-stop monitoring of installed backup power system
