Backup power supplies for TPCA factory in Kolín

Investor:   Toyota Peugeot Citroën Automobile Czech s.r.o.
Installation site:  Industrial zone Ovčáry, Kolín

The task:

  • to deliver and install backup power supplies for critical industrial application at the automobile factory

Optimal approach:

  • a quick analysis of possible loads, precision of energy balance parameters;
  • the definition of operational limitations for future production line;
  • identification of needs related to unspecified electric loads, determination of the availability standard for powered equipment in terms of limited task specification;
  • to protect the paint shop line against stopping in an intermediate position, when the production cycle is incomplete;
  • to avoid the impact of inrush currents (of motors) on the UPS system;
  • to present the offer for delivery and installation to the client

Added value of realized concept:

  • ALTRON designed a powerful, robust and highly available power supply system consisting of two UPS units with nominal output power of 400kVA per unit, operating in parallel – redundant mode 1+1; autonomy time of the whole system is 8 minutes