Power supply systems for toll gates Kapsch
Investor: Kapsch Telematic Services s.r.o.
Installation site: Line project on territory of the Czech Republic
The task:
- to ensure electric energy for the toll gates until they are cabled to the public grid, at the time unavailable due to long distances and legal limitations;
- to propose the technical and organizational measures in order to ensure continuous operation of generating sets and to minimize the penalty risks due to energy outage
Optimal approach:
- processing of the project and economical analysis of operational, maintenance and service costs of the technologies in question;
- a business offer showing possible variants; investor decided to outsource reliable generating sets with low fuel consumption and a full package of operation services;
- installation of the remote monitoring system, fuel tank for extended autonomy operation w/ dual layer shell, reinforcement of the service personnel on duty
Added value of realized concept:
- ALTRON ensured reliable supply of energy for 67 toll gates within 6 weeks;
- the technology had been monitored in 7x24x365 mode and ALTRON ensured regular fuel deliveries and timely exchange of operational fluids