Security audit of the KYIVSTAR data centre’s NCPI
Investor: KYIVSTAR GSM JSC
Installation site: Kiev, Ukraine
The task:
- to elaborate a complex assessment report on the data centre
- to evaluate its physical security and its non-IT infrastructure
Optimal approach:
- the execution of technological and security audits on site, i.e. the complex recognition of the facility and the data centre’s locality;
- the assessment of physical protection of the DC;
- the evaluation of operated technology and its parameters;
- determination of overall availability of the non-IT critical infrastructure in accordance with international and national standards, including the industrial standard of The Uptime Institute;
- release of the Assessment report with the Letter of recommendations while considering all known goals of the data centre’s owner
Added value of realized concept:
- ALTRON analysed and categorized the availability requirements for both computer rooms and evaluated the ability of the non-IT infrastructure to work in non-stop operation modes 7x24 and 365x7x24;
- the audit revealed potential direct economic loss in case of failure of specific non-IT components and recommended corrective measures to avoid and reduce risks