Audit of the Data Centre
Audit of the technology centres
Audit of the data centre's critical technologies
Audit of the data centre security
Technology Audits
Audit of the Installation Site
Audit of the Power System Infrastructure
Audit of the Air-Conditioning Infrastructure
Audit of the Physical Safety and Security
Audit of the Fire Detection and Suppression
Audit of the Physical Infrastructure
Audit of the Surveillance and Monitoring System
Operation Audits
DataCentre
EnergyCentre
KlimaCentre
Process Audits
Audit of the Process Management
Audit of the Document Management
Audit of the Periodic Activities
Audit of the Escalation Procedures
Audit of the Waste Material Disposal
Determination of the Data Centre's availability (TIER)
Determining the Data Centre's Availability as per ALTRON Best Practices
Determining the Data Centre's TIER as per ALTRON interpretation of TIA-EIA 942 TIER rating topology
Measurement of parameters
Measurement of Electric Parameters (test box)
Measurement of Electric Parameters (analyzer)
Measurement of Transition Effects
Measurement of the Battery Capacity
Measurement of the Air-Conditioning Parameters
Measurement of the Air Temperature Map
Measurement of the Temperature Maps by Thermovision
Measurement of the Noise Emissions (Screening)
Measurement of the Noise Emissions (Official)
Measurement of the Exhaust Gas Emissions (Official)
Analyses
Analysis of the Data Centre's Environmental Impacts
Analysis of the Power Usage Efficiency (PUE)
Analysis of the Power Balance
Analysis of Measured Parameters
Analysis of the System Availability